Allowing manufacturing engineers to write the "manufacturing script" for an assembly process and display that script directly onto the target assembly.

Plan: Write the Script

<span>Plan:</span> Write the Script

Produce: Display the Script

<span>Produce:</span> Display the Script

Reduced 80 hours on Nacelle Inlet Duct

- Cleco and fastener installation

Reduced 96 hours on Wing Skin Installation

- Template placement, drill guidance, fastener install

Reduced 80 hours on Mid-life Modification

- Install 4-layer doublers over troop door on cargo plane – fastener installation

This disruptive manufacturing technology has saved more than 200 hours per plane and a potential $111 million for the F‐35 program alone. ProjectionWorks will revolutionize how we assemble, maintain and repair our fleets – from jets, to submarines, to ships, to satellites.

Maximize your assembly efficiency.